And if the budget does not stretch to everything the project says?
You say what is left uncovered and the client decides. If what has to be protected needs twelve points and the money covers eight, the honest thing is to point out the four missing ones, what happens if someone gets in there and in what order they should be added. The alternative —spreading eight cameras over twelve places so the drawing looks full— gets handed over just as neatly, and what it hands over is a feeling.
There is almost always a way to split it into phases that does not ruin the result: leave the containment, the power and the electronics ready for what is coming and buy the equipment later. That costs little during the works and a great deal when ceilings have to be opened again.
And there is one line where we do not do that, which is fire. Fitting fewer detectors than the project says, leaving the warehouse at the back for later or handing over without testing the whole installation transfers the risk to the client without the client knowing, with our signature underneath. We would rather lose the job entirely, and we have lost it.
Where it is set out in full.
All the questions.
Five hundred and forty-four, grouped by topic. Each with its own page.
Get started
See it working.
A written answer is enough to decide whether it interests you. To know whether it works at your site you have to see it on a real scene, with the image as it is and, on top of it, what the system understands from it. That is on the IRIS Neural website, which is the group's product.